Day Nine was a busy one!
Eli, the plumber, came early and finished up his work just as Kirk, the tile man, arrived. Then Kirk mixed up the concrete and spread it and did the shower floor. Then Eli had to come back to adjust something where Kirk found a very small leak in one of the new pipes.
After that was all done Chris and Kevin came by and carried out all the trash. They also measured for the drywall. Everyone was done by about 1:00! So I had a swim at the "Y" and then went to work.
Here's the new "pitched" shower floor at this stage.